| Product Height: |
12" |
15" |
18" |
21" |
24" |
27" |
30" |
33" |
36" |
| C to C Spacing: |
12' |
12' |
14' |
14' |
14' |
14' |
14' |
14' |
14' |
Liquid Storage (Gal per LF): |
11.2 |
14.0 |
16.8 |
19.6 |
22.4 |
25.2 |
28.0 |
30.8 |
33.7 |
CT DPH Credit (SF per LF): |
7.9 |
9.4 |
11.0 |
12.5 |
14.0 |
15.5 |
17.0 |
18.5 |
20.0 |
Actual Sand Interface (SF per LF): |
17.6 |
21.1 |
24.8 |
28.4 |
32.0 |
34.7 |
38.3 |
41.9 |
45.7 |
Total Product Height Middle of Trench Above Pipe (inches): |
18 |
21 |
24 |
27 |
30 |
33 |
36 |
39 |
42 |
Approx Stone Per 10' Section, Cubic Yards (includes a Safety Factor): |
2.5 |
2.5 |
2.5 |
3.75 |
3.75 |
3.75 |
5.0 |
5.0 |
5.0 |
Approx Sand Per 10' Section, Cubic Yards, for Base & Fingers & 12" surrounding (includes a Safety Factor): |
5.0 |
5.0 |
5.0 |
7.0 |
7.0 |
7.0 |
8.5 |
8.5 |
8.5 |
| Driveway Installation: |
Increase cover over pipe from minimum 2" stone to 12" total of stone and/or process. |
| Distribution Pipe: |
ASTM D3034 SDR 35 perforated with bell and spigot ends, standard for all installations |